**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
$16.49
$29.99
Safe 45%
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety** **Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety** **Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety** **Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety** **Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety** **Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety** **Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
**Upgraded Solar Ground Lights - Waterproof Outdoor Garden Lights, 12 Pack Warm White LED Landscape Lighting for Pathway, Yard, Deck, Lawn, Patio & Walkway | Perfect for Garden Decor & Nighttime Safety**
$16.49
$29.99
45% Off
Size:
4 Pack
4 Pack
8 Pack
12 Pack
16 Pack
Color:
White Light
White Light
Warm Light
Blue Light
Quantity:
Delivery & Return: Free shipping on all orders over $50
Estimated Delivery: 10-15 days international
11 people viewing this product right now!
SKU: 88134422
Guranteed safe checkout
amex
paypal
discover
mastercard
visa
apple pay
shop
Description
During transportation, the pathway lights solar powered switch may be accidentally turned on, which consumes electricity and is difficult to charge. After receiving the driveway lights, please turn the switch to ON (Turn it OFF at night), and place it in a sunny place for 3 days before installing and using the light (keep the switch ON during normal use.).Before using the brackets, it is best to loosen the soil with a shovel and dig a suitable hole for the brackets (so as not to directly push them into the brackets and damage them).Please keep the solar panels as clean as possible (dirty panels are not conducive to solar energy storage).For best results, please install the walkway solar lights for outside in a place where there is direct sunlight and no obstacles. (Avoid installing on tile eaves, trees, window sills and other places with shade and obstacles. The more direct sunlight the solar ground lights receives during the day, the longer it will be on at night)If there is no strong sunlight or in winter, it may take longer to fully charge the lights. Make your night scene more beautiful~ Flower bed lights perfect for your walkway / path / garden / terrace / lawn /driveway/sidewalk/pathway / backyard etc. The best outdoor solar power lights brightest design, no additional cable wiring is required. When it receives solar energy on a sunny day, the outside solar lights for walkway is fully charged with the help of an integrated light sensor, and it will automatically light up at night for up to 6-10 hours (affected by the weather), and will automatically turn off during the day. Sidewalk lights solar powered made of stainless steel and ABS materials, it can be sealed well and effectively isolate water and fog. It can still work effectively in bad weather conditions. Specification: Material: Stainless Steel & ABS Bulb Type: 8 LEDs Solar Panel Power: 2V/100mA Power: Built-in 600mAh Ni-MH battery Color: Warm-white(like yellow) Charging: >8 hours Working: 6-10 hours (affected by the weather) Waterproof: IP65 NO Do not install the outdoor pathway lights solar powered in the shadow of obstacles such as trees, eaves, windowsills, etc. YES In order to get the best results, the solar ground lights should be installed in a place where it can be directly exposed to sunlight NO Do not place solar ground lights under other lights such as street lights. YES When the surrounding environment becomes dark, the light will automatically light up. Easy to Install Flip the switch on the back of the lights to ON.Insert the long gap bracket into the corresponding hole on the back of the light.Insert the other bracket into the long gap bracket and the corresponding hole.Use a shovel to dig a suitable hole to loosen the soil, and then bury the assembled lights. Easy to Install Flip the switch on the back of the lights to ON.Insert the long gap bracket into the corresponding hole on the back of the light.Insert the other bracket into the long gap bracket and the corresponding hole.Use a shovel to dig a suitable hole to loosen the soil, and then bury the assembled lights.
More
Shipping & Returns

For all orders exceeding a value of 100USD shipping is offered for free.

Returns will be accepted for up to 10 days of Customer’s receipt or tracking number on unworn items. You, as a Customer, are obliged to inform us via email before you return the item.

Otherwise, standard shipping charges apply. Check out our delivery Terms & Conditions for more details.

Features

Upgrade version solar lights Solar Lights for Outside In contrast to the 6 LEDs of others, our solar floor lights outdoor consist of 8 LED lights, which means that they generate more light for your path. With a fully charged battery the ground light garden will last for 6 ~ 8 hours

Light up any place Disk Lights provide perfect lighting for your courtyard, flower bed, gardens,backyard, walkways, pathway, yard, driveway, lawns and corridors, etc. to add a beautiful night scene scene. Just place the step lights where light is needed at night. No need to change cables or batteries, use free solar energy

Easy to Install Our solar motion lights outdoor only takes 15-20 seconds to install the ground light in your desired location with a thorn. First turn on the switch, the outside lights for house will turn on automatically in the dark and off in daylight or bright light

Safe to use Flat solar pathway lights can effectively isolate the water and mist. The solar ground lights can be used in any weather such as rain, snow, frost or sleet

Quality service We offer perfect solutions for dissatisfied customers within 24 hours. Refund your purchase price or a replacement! Please contact us if you have any questions. Motion sensor outdoor lights, motion lights for outside

Reviews
*****
Verified Buyer
5
I recently purchased these solar ground lights, and they have exceeded my expectations! Installation was incredibly easy—just push them into the ground, and they’re ready to go. They charge well during the day, even in partially cloudy conditions, and provide a beautiful, warm glow that enhances my yard and pathway at night.The brightness is impressive, much better than other solar lights I’ve used before. They create a lovely ambiance while also adding a practical layer of safety along my walkway. The waterproof design is a huge plus—I’ve had them through a few heavy rains, and they continue to work flawlessly.Another thing I appreciate is that these lights are low-maintenance and energy-efficient. No wires, no fuss—just reliable illumination every night. If you’re looking for an affordable yet stylish way to light up your garden, patio, or pathway, I highly recommend these solar ground lights!✅ Pros:✔️ Easy to install✔️ Bright and long-lasting✔️ Waterproof and durable✔️ No wiring needed—solar-powered❌ Cons:None so far!I’m very happy with my purchase and will likely buy more to complete my outdoor lighting setup. Highly recommend!

You Might Also Like